top of page
Skagit Transfer & Recycling Station
Skagit County Public Works
Mount Vernon, WA

 

Architect: 

KPG

Seattle, WA

 

Description: 

Construction of a pre-engineered metal building for solid waste transfer operations as well as a maintenance and staff building, scalehouse and paybooth. The project involved extensive storm system sitework in addition to asphalt paving, retaining walls, push walls and the installation of vehicle and truck scales. All work was done while keeping the facility open to the general public.

BUILDINGS & STRUCTURES
 

Buchanan Towers Fire Alarm & Sprinkler Upgrade
Western Washington University
Bellingham, WA

 

Architect: 

Rolluda Architects, Inc.

Seattle, WA

 

Description: 

Project involved fire alarm and sprinkler system upgrades in addition to architectural upgrades such as new flooring, ceiling finishes, lighting, casework and electronic entry systems.

Additions to Rainier Elementary School,
Modernization to Rainier Middle School
Rainier School District
Rainier, WA

 

Architect: 

JFC Architects, Inc.

Longview, WA

 

Description: 

Renovating and building two structures at the same time, including a 15,000 square foot addition on the existing elementary school and total renovation and abatement of the 25,000 square foot middle school within the summer vacation. Though the undertaking was monumental, BOSS substantially completed this project ahead of schedule to allow classes to take place after the summer break. The work included demolition, wood framing, mechanical, electrical, fire suppression, all finishes and classroom cabinets in both buildings.

WWU Wilson Library 3rd & 4th Floor
Western Washington University
Bellingham, WA

 

Architect: 

James Williams Architects

Bellingham, WA

 

Description: 

Project included the demolition of several small seminar rooms on the 3rd and 4th floors of Wilson Library and the construction of small seminar rooms in other locations. The project also included electrical and mechanical upgrades.

St. Luke's Memorial Episcopal Church Steeple Repair
St. Luke's Memorial Episcopal Church
Tacoma, WA

 

Architect

BOSS Construction, Inc.

Bellingham, WA

 

 

Description: 

Removal and repair of a 100 foot high historical copper steeple and bellfry as well as structural columns and bracing under the belfry. The design consisted of new steel columns to replace wood yet keep the original wood exterior. The work included removal, inspection and repair/replacement of all ornate wood moldings as well as the design of an anti-bird protection system to shield the refurbished bell and new structure.

Toledo Elementary School Phase 2 Addition
Toledo School District
Toledo, WA

 

Architect: 

CSCB Architects, PC

Vancouver, WA

 

 

Description: 

The addition of a gymnasium and classrooms totaling 13,300 square feet. Sitework was also performed including a new parking lot and the resurfacing of existing playgrounds.   The addition of a wood framed gymnasium and classrooms totaling 13,300 square feet. In addition to the building sitework, work included utilities, fire loop, new parking lot and the resurfacing of existing playgrounds.

Rainier Elementary School
Rainier School District
Rainier, WA

 

Architect: 

CSCB Architects, PC

Vancouver, WA

 

 

Description: 

The construction of a new 25,729 square foot elementary school building with complete sitework, utilities, septic system, landscaping, slab on grade, wood framing, classroom cabinets, brick veneer, composition roofing and mecanical mezzanines.

Blaine Triplex Relocation
Blaine, WA

 

Description: 

BOSS took an existing triplex from the new location of the Peace Arch Border Station, cut it in three pieces and moved it through town to its new location. The triplex was set up on a new foundation, hooked to all utilities, brought up to code requirements with a new fire sprinkler system. Exterior improvements included landscaping and siding work.

bottom of page